Complete remodel of existing deck and garage that was converted into an ADU to become a Music room, in progress. This project required the complete reconstruction of the roof and foundation using three steel beams at 22' long each and enlarging the concrete foundation to ensure the deck was structurally sound. In progress are the flooring install, millwork and paint inside, and the siding and soffits outside.